Tuesday, December 06, 2022

Visit the Projects Gallery

csa-logo

Factory-built buildings are constructed in sections:

transportation1
  • Superior Product

    While your building is under construction, the site works can already be well underway. With our five facilities located throughout Ontario, Senator Group can harness our resources to deliver a superior product saving you time which leads to significant monetary savings.

  Read more...

recycle-logo

Sustainable • Durable • Adaptive • High Quality

green benefits
  • Reduced material use

    We use less building materials through our advanced framing, building techniques and approach to building construction. Our factory controlled process creates less material waste and reduced energy consumption compared to on-site construction.

  Read more...

recycle-logo

Minimum risk exposure and maximum upside for any firm looking for factory-built solutions:

  • Experience

    Senator Group is the lead firm, but is not a single entity that is undertaking the design-build of your project. The experience of our staff represents a combined total of over 120 years. Our comprehensive organization can handle the size, complexity and breadth of any project.

  Read more...

Advantages:

We will build to your exacting requirements. We believe that our clients should be as much a part of the design process as possible to tailor the right solution to your specific needs.

Time Savings = Financial Savings

  • Reduced Construction Cost Financing
  • Faster Track To Occupancy and Project Revenue Generation
  • Faster Turnaround of Investment & Cash Flow
  • Faster Re-Deployment of Resources & Reduced Risk

  Read more...

Architecture » Take Two: 7 Adaptive Reuse Projects We Love

12alder house living room view through window rectangle
by Diana Budds
As the way in which people use cities morphs form generation to generation, we're left with dormant buildings—those that have outlived their original purpose, but are rife for enterprising architects and designers to give them a second wind. This latent stock might include industrial remnants, former school houses, barns, and

Read more http://feeds.dwell.com/~r/dwell/articles/~3/zGOERsIdGnE/take-two-7-adaptive-reuse-projects.html

BackOffice Login