Tuesday, December 06, 2022

Visit the Projects Gallery

csa-logo

Factory-built buildings are constructed in sections:

transportation1
  • Superior Product

    While your building is under construction, the site works can already be well underway. With our five facilities located throughout Ontario, Senator Group can harness our resources to deliver a superior product saving you time which leads to significant monetary savings.

  Read more...

recycle-logo

Sustainable • Durable • Adaptive • High Quality

green benefits
  • Reduced material use

    We use less building materials through our advanced framing, building techniques and approach to building construction. Our factory controlled process creates less material waste and reduced energy consumption compared to on-site construction.

  Read more...

recycle-logo

Minimum risk exposure and maximum upside for any firm looking for factory-built solutions:

  • Experience

    Senator Group is the lead firm, but is not a single entity that is undertaking the design-build of your project. The experience of our staff represents a combined total of over 120 years. Our comprehensive organization can handle the size, complexity and breadth of any project.

  Read more...

Advantages:

We will build to your exacting requirements. We believe that our clients should be as much a part of the design process as possible to tailor the right solution to your specific needs.

Time Savings = Financial Savings

  • Reduced Construction Cost Financing
  • Faster Track To Occupancy and Project Revenue Generation
  • Faster Turnaround of Investment & Cash Flow
  • Faster Re-Deployment of Resources & Reduced Risk

  Read more...

Construction News

HCC reports third quarter loss

Indian contractor hit by project delays and higher costs, says difficult economic environment is affecting results...

Read more...

UK construction insolvencies rise

Nearly 10,000 construction and manufacturing companies went under in last two years, with 2012 also looking challenging...

Read more...

Slipformed rail tunnel bed

Wayss & Freytag used a Gomaco Commander III slipform paver to construct the track bed and walkway for the Finne Tunnel, part of the high speed rail line between Leipzig and Erfurt, Germany....

Read more...

John Deere welcomes GPS test results

Independent analysis reveals that proposed Lightsquared signal would cause ‘harmful interference’ with GPS receivers...

Read more...

Marubeni fined US$ 54.6 million for Nigerian bribes

Latest penalty brings all five companies involved in Bonny Island bribery case to account...

Read more...

BackOffice Login