Tuesday, December 06, 2022

Visit the Projects Gallery

csa-logo

Factory-built buildings are constructed in sections:

transportation1
  • Superior Product

    While your building is under construction, the site works can already be well underway. With our five facilities located throughout Ontario, Senator Group can harness our resources to deliver a superior product saving you time which leads to significant monetary savings.

  Read more...

recycle-logo

Sustainable • Durable • Adaptive • High Quality

green benefits
  • Reduced material use

    We use less building materials through our advanced framing, building techniques and approach to building construction. Our factory controlled process creates less material waste and reduced energy consumption compared to on-site construction.

  Read more...

recycle-logo

Minimum risk exposure and maximum upside for any firm looking for factory-built solutions:

  • Experience

    Senator Group is the lead firm, but is not a single entity that is undertaking the design-build of your project. The experience of our staff represents a combined total of over 120 years. Our comprehensive organization can handle the size, complexity and breadth of any project.

  Read more...

Advantages:

We will build to your exacting requirements. We believe that our clients should be as much a part of the design process as possible to tailor the right solution to your specific needs.

Time Savings = Financial Savings

  • Reduced Construction Cost Financing
  • Faster Track To Occupancy and Project Revenue Generation
  • Faster Turnaround of Investment & Cash Flow
  • Faster Re-Deployment of Resources & Reduced Risk

  Read more...

Construction News

Product Spotlight » IKEA PS Collection

IKEA PS collection rectangle
by Kelsey Keith
Affordable furniture emporium IKEA inspires some conflicted feelings. On the one hand, the brand's products are reasonably priced (sometimes astonishingly so), hack-able, and when they are good, they are very very adaptable (case in point: kitchen cabinets). On the other, you aren't paying $49.99 for a rug that your grandchildren...

Read more...

Backstory » The Making of Screenplay: Part 3

week three Screenplay 6 rectangle
by Jenny Wu
Jenny Wu, a partner at Oyler Wu Collaborative, documents the process from design through fabrication of their latest installation, Screenplay, to be featured at the upcoming Dwell on Design 2012. Part 3: The Big Reveal. A designer is an emerging synthesis of artist, inventor, mechanic, objective economist and evolutionary strategist....

Read more...

Architecture » Charlotte Perriand's Mountain Prefab

cassina refuge exterior rectangle
by Amanda Dameron
For the first time ever, Cassina has constructed a prefab mountain dwelling conceived by Charlotte Perriand and Pierre Jeanneret from the drawings the pair created in 1938.
Architecture » Charlotte Perriand's Mountain PrefabArchitecture » Charlotte Perriand's Mountain PrefabArchitecture » Charlotte Perriand's Mountain PrefabArchitecture » Charlotte Perriand's Mountain PrefabArchitecture » Charlotte Perriand's Mountain Prefab...

Read more...

Product Spotlight » Salone 2012: Dror for Tumi

Dror Tumi Front Back rectangle
by Alexandra Polier
Back again in Milan this year is the ever-present Dror Benshetrit,who wowed us in years past with his Peacock Chair for Capellini (now in the Metropolitan Museum of Art’s permanent collection) and his QuaDror installation last year at Interni (which got him shortlisted for the Buckminster Fuller Prize in 2011). This year...

Read more...

Outside » Dream Hatcher

Outside » Dream Hatcher
by Carren Jao
Our latest special issue, Dwell Outdoor, is on newsstands now and available to order here. A guidebook of sorts for making super-livable indoor/outdoor space, Dwell Outdoor pulls out some incredible al fresco rooms and highlights never-before-seen houses, treehouses, fire pits, and pools, as well as the products to re-create them at...

Read more...

BackOffice Login